DATA CENTER Montgomery

1

Building

(Operational)

34,600

Square Feet

5

Critical MW

(Committed & Planned)

Our Montgomery Data Center Project

As Alabama’s capital, a center for military education, and a home to automotive manufacturing and technology businesses, Montgomery boasts a strong tradition of leadership and service. DC BLOX is excited to join this community as we develop our Montgomery data center, contributing digital infrastructure that supports the services its businesses and residents rely on.  We look forward to working alongside local business and community leaders, building lasting relationships, and supporting the ideas and investment moving Montgomery and the River Region forward. 

DC BLOX Montgomery, AL building 1 Leased

Montgomery Features

Building Specifications

34,600 sq. ft. total building, 16,200 sq. ft. of data hall space

One data hall

Planned capacity: 450 racks

250 psf floor load

Data hall on slab; no raised floor

Security

24/7 staffed security, campus CCTV

Power

1.25 MW currently installed critical IT load; designed for up to 5 MW at full design

12.5 kV incoming service

Approximately 2,500 kVA transformer; 12.47 kV, 600 A transfer switch

1,250 kW UPS modules in a 4+1 block-redundant configuration

Generators: one 2.25 MW unit and four 2.5 MW units

Fuel storage for 24 hours at 100% load; 4,200-gallon belly tank

Cooling

Critical cooling equipment: N+2

Power usage effectiveness (PUE): 1.5

Montgomery Alabama data center site plan

Montgomery Site Plan

Total Square Footage: 34,600

Total Capacity: 5MW

Location

7610 Bill Joseph Pkwy
Hope Hull, Alabama 36043

Email: [email protected]

Phone: 877.590.1684